What done means now
If you’ve worked on a software team any time in the last decade, you know what “done” meant: a card made it to the last column.
For years, we measured work by the process around it. Sprints had story points and a velocity you had to defend. Standups were polite status theater—what I did yesterday, what I’ll do today, what’s left.1 Being green on Slack counted. A feature needed a spec, a review of the spec, and a sign-off before anyone even opened an editor.
It sounds absurd when you say it out loud, but it made sense at the time. All of that machinery was measuring effort, because effort was the scarce thing.
Then effort got cheap
Coding agents broke that math.
A change that used to take you a week of typing now takes an afternoon of directing and reviewing. And once output gets that cheap, counting the effort behind it tells you almost nothing. You can burn through every story point in the sprint, close every ticket, and leave your users in the exact same spot they were in on Monday morning.
So we’re changing what counts on our team. We’re still in the middle of it,2 but the shape is clear:
- Small teams own results. One engineer—or a pair—owns a piece of work end to end. No hand-offs to wait on, no “that’s another team’s queue.”
- Agents do the grunt work. You decide, direct, and review. You don’t need to hand-type every line to own the result.
- Shipped and demoed is the bar. Work doesn’t count because a PR is merged. It counts when it’s live and someone has actually seen it work.
- Shipping still isn’t the finish line. A launch that moves nothing for users or the business isn’t done. The real question is which number moved, and by how much.
The next step: outcomes
If you’re wondering where this goes once shipping itself gets easy, the Principles of Outcome Engineering put words to it better than I could.
The distinction is simple: an output is something you shipped. An outcome is something that must stay true—written down alongside how you’ll prove it’s true, and what the system is allowed to touch to keep it that way.
Here’s what that difference looks like on one real piece of work:
As a task: Build the weekly campaign report export.
As an outcome: Every brand with an active campaign sees last week’s results in its dashboard by Monday at 9:00 without asking anyone. We’ll know it’s working because report requests to account managers drop to zero. The system may change the reporting service and the dashboard—but nothing in billing.3
As a task
Shipped, ticket closed. Nobody watches it after.
As an outcome
Held at its target. When it breaks in March, someone fixes it that day.
Notice what changes?
The task ends the moment the export ships. The outcome doesn’t. If a new data source silently breaks the numbers in March, the outcome is false again—which means it’s someone’s problem today, not a backlog ticket for next quarter. The manifesto describes this as “done” being a state, not a milestone: the outcome is the thing you keep, and the code underneath it is allowed to be rewritten whenever it stops holding up.
It also changes where your attention goes. When an outcome carries its own proof, nobody needs a status meeting to find out if things are on track. You spend your time on the judgment calls only a human should make:
- Which outcome actually matters most right now.
- What the system is allowed to touch (and what’s off-limits).
- When a trade-off needs a person to step in.
Where that leaves us
Here’s the whole shift in one glance:
| Era | What we measured | What “done” meant | Who held the wheel |
|---|---|---|---|
| Effort | Points, hours, process | The card moved | Engineers typing every line |
| Output | Shipped & demoed work | The number moved | Engineers directing agents |
| Outcome | What stays true over time | The number stays where it should | Humans on judgment, systems on upkeep |
We moved from measuring effort process to measuring output because agents made effort cheap. Those same agents are what make it possible to measure what actually matters: what stays true for your users and your business, for as long as they rely on it.
- EffortThe card moved.
- OutputThe number moved.
- OutcomeThe number stays where it should.
Done used to mean the card moved. Now it means the number moved. Next, it means the number stays where it should.
If you only read one thing on this, read the manifesto. It’s short, and it’ll probably give you the words for the shift you’re already starting to feel on your own team.
Footnotes
-
Bonus points if everyone spent the first four minutes trying to remember what they actually did yesterday by scrolling through their own Git commits. ↩
-
Saying “we’ve completely figured this out” would be a lie. Some habits—especially reaching for a ticket before asking what number we want to move—die hard. ↩
-
That last sentence does a lot of heavy lifting. Giving an agent (or a team) a clear goal without clear boundaries is how you wake up to a very creative billing migration nobody asked for. ↩